Journal
- 2026-09-30
When should a supplier’s product range have separate entries?
A supplier’s range should be split into separate system entries when its products have distinct assessed scopes or materially different assemblies and uses. Keep the supplier ident
- 2026-09-30
Volumetric or panelized: classify what leaves the factory
Classify a construction system by the physical assembly that leaves the factory: a volumetric system delivers three-dimensional structural modules, while a panelized system deliver
- 2026-09-30
How to record a correction to a technical source
When a technical source is corrected, update the affected reference field and keep the earlier document in the record as superseded evidence. Record the replacement document’s iden
- 2026-09-30
How to distinguish structural modules from bathroom pods
A directory should classify an offsite unit by its role in the building’s primary structure, then record its room completion and supplied scope in separate fields. A three-dimensio